projectbritain.com
Swan Upping 2010
Times are approximates and based on 2009
Exact times and locations for 2010 have yet to be confirmed.
What is Swan Upping? See the photos
MONDAY JULY 2014
Eton Bridge 08.15 – departure point (The bridge is between Windsor and Eton)
Boveney Lock 09.30
Boulters Lock 14.45
Cookham 16.30TUESDAY JULY 2014
Cookham 15.00 – departure point
Marlow Lock 17.00WEDNESDAY JULY 2014
Marlow Bridge 09.00 – departure point
Hurley Lock 10.30
Hambleden Lock 12.00
Henley Town 13.30
Marsh Lock 16.00
Shiplake Lock 17.00
Sonning Bridge 18.00THURSDAY JULY 2014
Sonning-on-Thames 09.00 – departure point
Caversham Lock 10.30
Mapledurham Lock 12.30
Goring Lock 17.00
Moulsford 18.00FRIDAY JULY 2014
Moulsford 09.00 – departure point
Benson Lock 10.15
Clifton Hampden Bridge 13.00
Culham Lock 16.15
Abingdon Bridge 17.00
A pictorial guide to the River Thames
© Copyright 2013
I teach computers at The Granville School and St. John’s Primary School in Sevenoaks Kent.
primaryhomeworkhelp.co.uk